Standards

Home / Safety Health & Environmental / Standards


The environmental mitigation measures as addressed in the EIA and EMP shall be fully implemented to avoid and alleviate the Project’s impacts throughout the Construction Phase. The following relevant standards have thus been applied, based on the Lao PDR Law and the World Bank Group’s guidelines.

 

Emission Limit Value

The flue gas shall be treated by the Electrostatic Precipitator (ESP) and the Flue Gas Desulfurization (FGD) devices; while the stack emission from Power Plant shall meet the limit values as tabulated below: 

 

Parameter Averaging Period Emission Limit Value
(6% dry gas, excess oxygen content) #
Reference
Particulate Matter (PM) 24 hours 50 mg/Nm3 Ref.1
Sulfur Dioxide (SO2)* 24 hours 230 mg/Nm3 Ref.1
Nitrogen Dioxides (NOx)* 24 hours 510 mg/Nm3 Ref.1

Remarks : 

  • Ref 1 - IFC Thermal Power Plants, December 2008. Apart from SO2 which is given a range of 200-850 mg/Nm3, selection of the emission levels in the range is to be determined by EA, taking into account the Project’s sustainability and development, plus impacts and cost-benefits of the pollution control performance.  # At 0 degrees Celsius and 1 atmosphere (atm) pressure
  • Ref 2 - IFC EHS Coal Processing, April 2007

 

 

Ambient Air Quality Standard

A级人体片Prior to the construction period, an air quality monitoring was conducted and indicated that the concentration of the particulate matter less than 10 microns in diameter (PM10) was higher than the World Bank’s guidelines – especially during March to April – due to forest fires and agricultural crop residue burning which, like in other countries across the ASEAN region, have created smoke haze and dust particles in the atmosphere. Therefore, the Applicable Ambient Air Quality Standard agreed in the Concession Agreement is set up as interim targets for a staged approach to achieving the recommended guidelines. The PM10 limit values have gradually been reduced from 500 µg/m3 to 300 µg/m3; while the SO2 and NO2 limit values have not changed (please see details in the table below).

 

Parameter Period Ambient Air Quality Limit Value
Annual Arithmetic Mean 24 hr Average 1 hr Average
Particulate Matter less than 10 µm (PM10 ) NTP (1 Mar 2010) 100 µg/m3 500 µg/m3 -
From 1st day of year 2 to last day of year 3 80 µg/m3 400 µg/m3 -
from 1st day of year 4 to last day of year 5 70 µg/m3 350 µg/m3 -
from 1st day of year 6 to end of Concession Period 70 µg/m3 300 µg/m3 -
Sulfur Dioxide (SO2)* From NTP to end of Concession Period 0.1 mg/m3 0.3 mg/m3 0.78 mg/m3
Nitrogen Dioxides (NO2)* From NTP to end of Concession Period - - 0.32 mg/m3

 

Reference:

  • PM10 and NOs are referred to the World Bank Environment, Health & Safety Guidelines Mining & Milling-Open Pit, August 1995 
  • NTP means “Notice to Proceed”, or the commencement date of construction period

 

 

Ambient Water Quality Standard & Effluent Standard

Parameter Unit Ambient Water Quality Standard Effluent from Power Plant Effluent from Mining
pH

-

5-9 6-9 6-9
Temperature oC - < 3 degrees
differential
< 3 degrees
differential
DO mg/l 6.0 - -
BOD5 mg/l 1.50 - 50.0
COD mg/l 5.0 - 150.0
Total Suspended Solid (TSS) mg/l - 50.0 50.0
Oil and Grease mg/l - 10.0 10.0
NO3 –N mg/l 5.0 - -
NH3 –N mg/l 0.2 - -
Sulfate mg/l 500 - -
Total Coliform Bacteria MPN/ml 5,000 - -
Fecal Coliform Bacteria MPN/ml 1,000 - -

A级人体片  

 

Noise Limit Level

 

The noise limits shall be complied with, using any sensitive receptor installed in the potentially noise-affected ambient environment, surrounding the Project within both Hongsa and Muang Ngeun. 

  • Prior to the Commercial Operation Date, the Noise Study and Modeling has been applied as a tool to determine the Project’s “Best Noise Limits” for one-hour equivalent day (Ld) and one-hour equivalent nighttime (Ln) continuous noise level limits. Such limits shall be established by a Noise Expert, who is a consultant with expertise relevant to the Project, and agreed by MONRE
  • Noise from Blasting – The maximum level for airblast is 115 dBA. 
  • Intermittent Noise From Power Plant - Levels should not exceed 120 dB(A) at the Power Plant boundary when the steam blowing of the Power Plant pipework is carried out. 
  • From the beginning until after the Commercial Operation Date, the Company shall ensure that the 24-hour average noise from the Power Plant does not exceed 70 dB(A) at the Power Plant boundary, and that the instantaneous noise limit (other than the intermittent noise events described above) does not exceed 115dB(A) at the Power Plant boundary (the “Operating Period Limitations”).

 

 

Electric and Magnetic Fields

The design of transmission line needs to take into consideration the technique that ensures the exposure of Electric and Magnetic Fields (EMF) meets the standards defined in the table below. 

 

Frequency Electric Field (V/m) Magnetic Field (μT)
50 Hz 5,000 100

Reference: IFC EHS Guidelines, Electric Power Transmission and Distribution, April 30, 2007


写真人体 三级真人牲交 free欧美高清猪马牛 我和狗做了4年都没事 晚上喝酒了和狗狗做了 bt种子搜索 同房姿势108种 使劲里面痒想要 年轻的母亲线2免费 亚洲 动漫 偷拍 另类 校园 爸爸快点我坚持不住了 japanese20matare成熟 熟透的岳 熟妇的荡欲 jessica jane ct50成熟 老熟妇乱子伦视频 亚洲五月六月丁香缴情 e欧美性情一线免费http 把你干到疼得下不了床 女人床上活好是啥样的 床戏 床 戏 三个人在一个床上做了 精品国产自在现线拍 免费A级毛片 特级做人爱c级 国内偷拍在线精品 快穿之炮灰女配逆袭记 达达免午夜起神影院 乡村无敌小兽医 小说 午夜电影街 日日擼夜夜擼 午夜免费啪视频在线 Taylor Vixen最好看的 好妈妈快点想死我了 我男朋友15cm感觉好短 啊将军好涨鼓起来别顶了 好朋友们的妈妈4 12 13x x videos china 老湿机看x试看十分钟 japnesses x xhd 好湿热花径 舌尖探进 老湿机看x试看十分钟 japanese visa教师 五个大佬跪在我面前叫妈 500篇短篇合 国产成 人 综合 亚洲 双性受合不垅腿攻 综合欧美五月丁香五月 男朋友几个朋友一起上我 呵呵我要别停我要死了 老师不行我做不下去了小说 宝贝我有点大你忍一下 大叔你的太大了我难爱 妈妈我太涨了帮帮我 国产精品香蕉视频在线 国产精品高清视频免费 朋友的姐姐线观高清2 欧美高清videosedexohd 迷人的保姆5线观高清 天天看高清影视在线观看 一本道理高清在线播放 日本一道本高清二区 天天看免费高清影视 一区二区三区高清视频 日本一大免费高清 欧美高清vitios 高清一区高清二区 天天看高清影视在线WWW 特级aav毛片欧美免费观看 日本特黄特色大片免费视频 天天看大片特色视频 免费A级毛片 特级做人爱c级 日本A级作爱片 中国A级毛片 A级人体片 香港三级 公憩关系小说 欧美三级片 秋霞理论在一l级 超级乱婬长篇小说 天堂v无码亚洲一本道 中文字幕乱码 电影在线观看 中文字幕乱码免费 中文亚洲无线码 日本无码不卡中文免费 日本一本道免费天码av 中文欧美无线码 国产av在在免费线观看 精品国产自在现线拍 亚洲AV国产AV手机在线 久久爱www免费人成 女人哪种下面最受欢迎 小妖精一天不做就难受呀 非会员试看一分钟做受小视频 女人的性承受极限 偷窥女教师 妈妈的朋友4线观高清 4攻一受同时做宿舍 我的妻子的姐姐2 电影 家里没人半夜就和姐姐 younggir第一次young 坐车跟姐姐那个 爸不不要了太满了流来了 能看到让你流水的小说 蜜汁在马背上流下来 喷个不停gif出处 喷潮白浆直流视频在线 女人喷潮完整视频 吹潮流的水能喝吗 色综合亚洲色综合吹潮 美国式禁忌 老汉开花苞 免费人做人爱的视频 真人性做爰 a级做爰片 美国c片做人爱视频 做爱网站 白小姐四肖必选一肖 younggir第一次young 宝贝我有点大你忍一下 国语自产一区第二页 不卡无在线一区二区三区观 日本一大免费高清 日本一本免费一二三区 亚洲欧美AV中文日韩二区 在线不卡日本v二区 w006.top 五个大佬跪在我面前叫妈 gif动态图视频第五十八期 亚洲五月六月丁香缴情 五月爱婷婷六月丁香色 综合欧美五月丁香五月 色婷亚洲五月 五月爱婷婷六月丁香色 十大免费最污的直播 口述在车里下面被添 公车上强行被灌满浓精 坐车跟姐姐那个 呵呵我要别停我要死了 么公的好大好硬好深好爽想要 使劲里面痒想要 一晚上要了小姑娘三次 想要嘛人家想啊你快点嘛 求你们不要了np 老公说想放在里面睡觉 好妈妈快点想死我了 500短篇超污多肉推荐 很肉到处做1v1青梅竹马 可以免费观看的av毛片 女人18毛片 日本毛片18禁免费 日本高清免费毛片大全 深夜A级毛片免费 世界十大禁片 18岁末年禁止观看试看一分钟 美国式禁忌5一11集 我的绝色总裁未婚妻 绝味儿媳妇txt 顶级少妇 荡公乱妇 玩弄放荡人妇系列 japanesewiif0孕妇 熟妇大尺度人体艺 玩两个少妇女邻居 美妇乱人伦小说 67194成l人在线观看线路 公憩关系小说 私欲小说 杂乱小说1第403部分 老师不行我做不下去了小说 图片区 偷拍区 小说区 销魂美女图库 做爱动态图 131美女做爰图片 gif动态图出处第900期 他抬高她的腰撞到最深处 甜宠肉H双处 年轻的母亲线2免费 2019中文字字幕在线不卡 在线看不卡日本AV 神马不卡电影院马影 4480yy私人影院 在线不卡日本v二区 w006. 年轻母亲4 年轻的老师1中字版 师年轻女老完整版在线观看 年轻的母亲5全集国语 jessica drake不带套 我家老公是禽兽 一本道东京熬加勒比 日本tvvivodes欧美 4480yy私人影院 Blog FreeXXXHD日本JaVhD 母性本能 Jazzjazzjazz日本 一道本无吗d d在线播放 一本到2019线观看 一道本不卡高清专区 不卡日本一道二区 日本一大免费高清 337p日本大胆欧美人术艺术 在线成本人视频动漫 日本免费一区 欧美在线成本人视频 日本强奷在线播放 免费人做人爱的视频 日本特黄特色大片免费视频 天堂v无码亚洲一本道 一本大道香蕉视频 男人插曲女人视频软件 女人体(1963) 特级做人爱c级 女人哪种下面最受欢迎 男人和女人做人爱视频体验 迷人的保姆5线观高清 正在播放chinese中国人 曰曰摸天天摸人人看 男人将机机桶女人30分钟 两个人做人爱视频大全 japanese20matare成熟 亚洲 动漫 偷拍 另类 校园 甜宠肉H双处 大叔好凶猛 男女做爰猛烈动图 亚洲欧美中文日韩视频 和搜子居住的日子2 xfplay每日稳定资源站姿 2019日日拍夜夜爽视频 午夜电影街 达达免午夜起神影院 92午夜免费福利757 午夜免费啪视频在线 老湿免费福利体检区 夜间福利片1000 老司机ae福利入口 中国freebi0deS老人 和老板在办公室BD v des中国老太 老汉开花苞 老巨人福利新导航 欧美肥胖老妇做爰 经理叫我一起陪两个老外吃饭 老司机影视67194 老司机72种新姿势解锁 小奶尖儿都挺立起来了 younggir第一次young 18school第一次 一晚上要了小姑娘三次 回娘家每次他都搞我 每次和爸爸做完再去上学 香蕉视频无限次观看 老公一晚四五次都不够 男生第一次吃我胸头 5个人同时玩我下面 一个添下面两玩上面哦 上面和下面同时喂饱你 上面吃奶下面湿 chinese帅哥19飞机guy 朋友的姐姐线观高清2 吵架后回娘家和父亲做 Taylor Vixen最好看的 么公的好大好硬好深好爽想要 好妈妈快点想死我了 岳你夹得好紧好爽 女人床上活好是啥样的 双性受合不垅腿攻 里面一动一动的好会吸啊 吸弄小核喝花水啊舌头 舌头在小豆豆上磨咬吸 翁熄粗大第二篇十四章 公么的粗大满足了我 老师太粗不行坐不下去 太粗太长弄死了我了 阵阵娇吟粗吼 公车上强行被灌满浓精 公么的粗大满足了我 被窝里的公息第十三章 被窝里的公息全章 我和公gong在厨房 翁公您的好长呀 荡公乱妇 老公说想放在里面睡觉 神秘老公惹不起 一下课男生就把我拉进厕所 w日本高清视频m免费 熟妇大尺度人体艺 妈妈的朋友4线观高清